Kitchens and bathrooms – bituminous base system

Reasons

Infiltrations

Condensations

Damage to coverings

Probable causes

Lack of maintenance

Non-existent waterproofing

Equipment Rupture

Wear and tear | deformations
Preparation

(Pre-existing supports)

Analysis of the support to identify constraints, particularly the state of the base and thickness.

Preparation of the substrate for application of the new waterproofing / thermal insulation system, such as cleaning, stabilisation and regularisation whenever necessary.

Regulatory requirements and/or load limitations, if any, must be respected.

  • 1. FLOORING ON SCREED
  • 2. IMPERSEP 150
  • 3. POLYSTER 40
  • 4. IMPERKOTE F
  • 5. PRE EXISTING SUPPORT, TREATED AND REGULARIZED